Categories
Calendar
November 2024 M T W T F S S « Jun 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 -
Recent Posts
Search
Blogroll
Author Archives: Anthony
Del Sol Targa Top Install
A customer stopped by for a Targa Top install this morning. We swapped all over the oem parts over in no time, and it fit prefect!
Posted in Installs
3 Comments
New Del Sol Carbon Fiber Targa Top
We just made a Carbon Fiber Targa Top for the Del Sol, it is light weight and looks amazing! Installation is a breeze, all of the OEM parts bolt on and snap together just like the original metal panel.
Posted in New Parts
Leave a comment
S2000 Hardtop install!
Scott stopped by to have us install his FRP Mugen style hardtop on his S2000. Featured Products: S2000 Hardtop Carbon Fiber OEM Hood MG Carbon Fiber Front Lip Carbon Fiber Side Diffusers Carbon Fiber OEM Trunk Carbon Fiber BYS Wing
Posted in Installs
2 Comments
Happy Halloween! Franken bumpers don’t scare us!
We recently got our hands on this rare Parts Station Duce (Now Discontinued) body kit from japan for the NA Miata, unfortunately it has seen better days. The sides skirts are in multiple pieces and the rear is not much … Continue reading
Posted in Project: Franken Bumper Repair
1 Comment
Project: Miata Roof Wing – Mold Complete
Steve completed the mold today, and began wet sanding any imperfections in the gelcoat. Upper Half: Lower Half:
Posted in Project: Miata Roof Wing
Tagged Fiberglass, Miata, Mold, Mold Construction, Spoiler, Wing
2 Comments
Project: Miata Roof Wing – Mold Release
Applying the PVA (Mold Release) to the Plug, prevents the mold from sticking.
Posted in Project: Miata Roof Wing
1 Comment
Project: Miata Roof Wing – Building the mold
Both sides of our wing will be finished, so we will need to create a closed mold. Which means there will be two half’s, the first step to create the top half of the mold is to define a parting … Continue reading
Posted in Project: Miata Roof Wing
1 Comment
Project: Miata Roof Wing – Plug Complete
After hours of Sanding, priming and more sanding the plug is finally complete. The next step will be making the mold and producing the final product.
Posted in Project: Miata Roof Wing
2 Comments